Reference

Council: Stonnington
Cluster: Hawksburn
Registered Aboriginal Party: Bunurong Land Council Aboriginal CorporationWurundjeri Woi Wurrung Cultural Heritage Aboriginal Corporation
current
Published:
Last updated:

On this page:

The vision for Malvern

The following vision for the Malvern train and tram zone activity centre is built from the Statement of Advice prepared by a Community Reference Group (CRG) made up of local community members.

Malvern, strengthened by the recent delivery of a strategic development at the Dandenong Road gateway, will continue to grow as a vibrant and well-connected mixed-use centre.

The centre is anchored by Glenferrie Road’s retail and commercial activity; Malvern Central; and the health and medical precinct along Wattletree Road. The centre will support new housing and investment, while protecting Glenferrie Road’s valued heritage character.

"We understand the need for development around train stations and main roads."

Malvern community member

What we understand about the place and how we’ve addressed it

Malvern is a well-connected, mixed-use centre anchored by Glenferrie Road’s fine-grain heritage shopfronts, diverse food and hospitality offerings, Malvern Central, and Wattletree Road’s health and medical precinct.

The Community Reference Group highlighted the importance of Heritage Overlays in shaping where taller development should occur.

We heard that the community is generally supportive of concentrating greater height along main roads and near the train station, provided this is done in a way that respects local character.

As part of our work, we've applied:

  • Heritage Main Street Core typology to all of Glenferrie Road and Station Street to create a continuous street appearance that is responsive to its heritage context
  • master planning requirements to Malvern Central to encourage the best design outcomes for the public on this large opportunity site
  • sun protection on Glenferrie Road and other roads that run east to west through the Malvern activity centre, including Wattletree Road and Station street
  • the lowest building heights of six storeys on Station Street and Claremont Avenue to reflect the smaller village character of the area.
  • a mix of primary and secondary active frontages along Glenferrie Road, Wattletree Road and key side streets to reinforce the area’s vibrancy
  • sensitive interface standards to residential areas immediately to the south of the centre, to ensure there is sufficient access to sunlight for north-facing windows given Wattletree Road’s east to west orientation.

Malvern core and catchment map

Map showing the Malvern activity centre

View the Hawksburn to Malvern and Toorak Village core and catchment map.

Malvern core and catchment explained

The core is the central part of the train and tram zone activity centre, closest to public transport, jobs and services. This area is best suited to accommodate more homes.

The catchment is the surrounding area within approximately 10 minutes’ walk of the core (around 800 metres).

As you move away from the commercial and community core of the train and tram zone activity centre, we expect that the proposed building heights will gradually decrease. This will allow a transition between the activity centre and the surrounding suburb.

In Malvern, the catchment is determined by a comfortable walking distance from transport and commercial high streets. This is seen in the south which ends at Dandenong Road and ends further north at High Street for the catchment around Hawksburn and Toorak stations.

Visit the How we’re planning page to find out more about core and catchment areas, new planning tools, streamlined planning processes and the approach to delivering more homes in train and tram zone activity centres.

Activity centre plans

The built form outcomes and building heights for the activity centre core are set out on the following plans:

Plan 9: Malvern typology, activation and setbacks.
Plan 10: Malvern building heights and sun protection.

The plans support the right types of homes being built in the places they fit best.

A map of the Malvern Activity Centre showing typology categories, required activation frontages, and building setback requirements across key streets, blocks, and precincts.
Plan 9 (above): Malvern typology, activation and setbacks (Note: Typology refers to a building type that is suitable for a particular set of lot types and locations. Street activation requires new buildings to provide open and inviting shopfronts to encourage lively and safe streets. A setback is the minimum distance a building must be placed away from a property boundary, road, or natural feature.)
A map of the Malvern Activity Centre showing preferred building heights and required sun protection measures across key streets, blocks, and precincts.
Plan 10 (above): Malvern building heights and sun protection. (Note: Key pedestrian street means a street where we have applied overshadowing controls to make sure there is sun access.)

Page last updated: 22/07/26

Reference

Council: Stonnington
Cluster: Hawksburn
Registered Aboriginal Party: Bunurong Land Council Aboriginal CorporationWurundjeri Woi Wurrung Cultural Heritage Aboriginal Corporation
current
Published:
Last updated: