Find a panel or committee

View details about a current planning panel, committee, standing advisory committee or inquiry.

>
Displaying 1 - 7 of 7 results
  1. Beaufort Bypass Inquiry and Advisory Committee

    Completed
    C50pyrn
    • 11 kilometres of dual carriageway outside Beaufort township
    • Building of overpass structures, roads and bridges
    • Advise on environmental effects of project
  2. Goschen Mineral Sands and Rare Earths Project Inquiry and Advisory Committee

    In progress
    GC218
    • Mining and processing of heavy mineral sands
    • Located 35 kilometres south of Swan Hill
  3. Suburban Rail Loop East Inquiry and Advisory Committee

    Completed
    GC197
    • 90-kilometre rail line connecting Frankston and Werribee lines
    • Development of 6 new train stations
  4. Victorian Murray Floodplain Restoration referral: Hattah Lakes North and Belsar-Yungera

    Completed
    GC202
    • Hattah Lakes North Floodplain Restoration Project.
    • Belsar-Yungera Floodplain Restoration Project.
    • Advise on potential environmental effects.
  5. Victorian Murray Floodplain Restoration referral: Vinifera, Nyah and Burra Creek

    Completed
    C78swan
    • Vinifera Floodplain Restoration Project
    • Nyah Floodplain Restoration Project
    • Burra Creek Floodplain Restoration Project
  6. Victorian Murray Floodplain Restoration Standing Inquiry and Advisory Committee

    In progress
    • 9 proposed restoration projects.
    • Advise on potential environmental effects.
  7. Viva Energy Gas Terminal Inquiry and Advisory Committee

    Completed
    C442ggee
    • Proposal for development of gas terminal at Refinery Pier in Corio Bay.
    • Advise on environmental effects and consider submissions of proposal.
    • Draft Greater Geelong planning scheme amendment C442ggee.

Refine

Filter by panel or committee

Filter by status