Proposal

Please Note: Proposal description below describes the amendment. To verify content of the final approved amendment see the Explanatory Report.

Introduce a Special Building Overlay over the land identified by Melbourne Water as being subject to natural overland flows in the event of a storm exceeding the design capacity of the underground drainage system. Introduce Schedules 1 and 2 to the Land Subject to Inundation Overlay which specify permit application requirements and referral exemptions.